{"id":2615,"date":"2026-06-09T02:30:00","date_gmt":"2026-06-09T02:30:00","guid":{"rendered":"https:\/\/www.huanhaizhongke.com\/stainless-steel-pipe-inspection\/"},"modified":"2026-06-09T02:30:00","modified_gmt":"2026-06-09T02:30:00","slug":"stainless-steel-pipe-inspection","status":"publish","type":"post","link":"https:\/\/www.huanhaizhongke.com\/ko\/stainless-steel-pipe-inspection\/","title":{"rendered":"\uc2a4\ud14c\uc778\ub808\uc2a4 \uc2a4\ud2f8 \ud30c\uc774\ud504 \uac80\uc0ac: \uad6c\ub9e4\uc790 \uccb4\ud06c\ub9ac\uc2a4\ud2b8"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h4>\ubaa9\ucc28<\/h4><nav><ul><li><a href=\"#why-quality-requirements-matter\">\ud488\uc9c8 \uc694\uad6c \uc0ac\ud56d\uc774 \uc911\uc694\ud55c \uc774\uc720<\/a><\/li><li><a href=\"#define-acceptance-criteria\">\uc218\ub77d \uae30\uc900\uc744 \uc815\uc758\ud569\ub2c8\ub2e4<\/a><\/li><li><a href=\"#common-nonconformities\">\uc77c\ubc18\uc801\uc778 \ubd80\uc801\ud569<\/a><\/li><li><a href=\"#inspection-plan\">\uac80\uc0ac \uacc4\ud68d<\/a><\/li><li><a href=\"#storage-and-transport\">\ubcf4\uad00 \ubc0f \uc6b4\uc1a1<\/a><\/li><li><a href=\"#claims-and-traceability\">\uc8fc\uc7a5 \ubc0f \ucd94\uc801\uc131<\/a><\/li><li><a href=\"#quality-comparison-table\">\ud488\uc9c8 \ube44\uad50\ud45c<\/a><\/li><li><a href=\"#receiving-checklist\">\uccb4\ud06c\ub9ac\uc2a4\ud2b8 \ubc1b\uae30<\/a><\/li><li><a href=\"#frequently-asked-questions\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/a><\/li><li><a href=\"#request-a-quality-review\">\ud488\uc9c8 \uac80\ud1a0\ub97c \uc694\uccad\ud558\uc138\uc694<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">stainless steel pipe inspection affects more than the line item on a purchase order. It influences whether material fits the drawing, runs through the intended process, passes receiving inspection, and performs in service. Inspection depth should follow service criticality, product standard, manufacturing route, welding status, cleanliness, and project code.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This stainless steel pipe inspection guide is written for industrial buyers, engineers, quality teams, and fabricators. It concentrates on measurable requirements and practical purchasing decisions, without assuming that one grade, tolerance, finish, or test plan is correct for every project.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/01\/1-34.jpg\" alt=\"stainless steel pipe inspection for industrial procurement and fabrication\" class=\"wp-image-1096\" srcset=\"https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/01\/1-34.jpg 800w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/01\/1-34-300x225.jpg 300w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/01\/1-34-768x576.jpg 768w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/01\/1-34-600x450.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"why-quality-requirements-matter\">\ud488\uc9c8 \uc694\uad6c \uc0ac\ud56d\uc774 \uc911\uc694\ud55c \uc774\uc720<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A stainless steel pipe inspection inquiry should begin with the finished component and its operating conditions. Typical uses for stainless steel pipe include process systems, water treatment, food equipment, chemical service, structural work, heat exchangers, and sanitary fabrication. The buyer should identify the load, environment, expected life, joining method, appearance requirement, and any regulatory or project specification that controls the work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">stainless steel pipe inspection becomes easier to specify when procurement receives input from design, production, and quality before quotations are requested. A decorative structural tube and a process pipe carrying hazardous media should not use the same receiving checklist. This review prevents a technically valid material from arriving in a form that creates avoidable cutting, forming, welding, installation, or inspection work.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"define-acceptance-criteria\">\uc218\ub77d \uae30\uc900\uc744 \uc815\uc758\ud569\ub2c8\ub2e4<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The material baseline for stainless steel pipe inspection should state grade, product standard, pipe size, schedule or wall thickness, manufacturing route, finish, end preparation, and service media. A familiar trade name is not a complete specification. The purchase order should identify the governing standard and edition required by the project, because requirements can differ by product form, thickness, grade, temper, and delivery condition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For stainless steel pipe inspection, buyers should compare certificate wording with the drawing and inquiry rather than relying on visual appearance. A useful independent industry reference is the <a href=\"https:\/\/worldstainless.org\/about-stainless\/\" target=\"_blank\" rel=\"noreferrer noopener\">\uc6d4\ub4dc\uc2a4\ud14c\uc778\ub9ac\uc2a4<\/a>. \ud504\ub85c\uc81d\ud2b8 \uc218\ub77d\uc740 \uc5ec\uc804\ud788 \uba85\uba85 \ub41c \uacc4\uc57d \ubb38\uc11c\ub97c \ub530\ub77c\uc57c\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"common-nonconformities\">\uc77c\ubc18\uc801\uc778 \ubd80\uc801\ud569<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Dimensions for stainless steel pipe inspection need nominal values and accepted variation. Depending on the product, this may include thickness or wall, width, length, diameter, straightness, flatness, ovality, camber, edge condition, coil dimensions, or profile geometry. The inspection plan should name size, wall, ovality, straightness, finish, ends, weld checks, test records, sampling, and acceptance sources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Do not request a tighter stainless steel pipe inspection tolerance simply because a smaller number appears more precise. Tolerance should protect fit, forming, sealing, machining allowance, line stability, and final performance. Unnecessary restrictions can reduce sourcing flexibility without improving the part.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"inspection-plan\">\uac80\uc0ac \uacc4\ud68d<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The production plan for stainless steel pipe inspection should name every important downstream operation: cutting, orbital or manual welding, bending, machining, pickling, passivation, polishing, testing, and installation. Material condition, directionality, residual stress, edge quality, surface cleanliness, and dimensional variation can affect these processes in different ways.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">stainless steel pipe inspection should be evaluated with the actual equipment and tooling limits in mind. Cleaning, pickling, passivation, polishing, and end preparation can occur after base-pipe testing and need their own release checks. When geometry or acceptance is demanding, a representative sample or first-article run is more useful than an unsupported promise that the material is generally suitable.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1.jpg\" alt=\"stainless steel pipe inspection surface and product form for quality review\" class=\"wp-image-2380\" srcset=\"https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1.jpg 800w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1-300x169.jpg 300w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1-768x432.jpg 768w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1-18x10.jpg 18w, https:\/\/www.huanhaizhongke.com\/wp-content\/uploads\/2025\/06\/What-is-Seamless-Stainless-Steel-Pipe-1-600x338.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"storage-and-transport\">\ubcf4\uad00 \ubc0f \uc6b4\uc1a1<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Surface requirements for stainless steel pipe inspection should be tied to function. Relevant conditions may include inside and outside finish, weld heat tint, iron contamination, scratches, pits, scale, cleanliness, and preservation before installation. A broad note such as clean surface or good finish is difficult to inspect consistently; visible zones and functional contact areas should have objective acceptance language.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Handling and storage can change stainless steel pipe inspection after production. clean end caps, protected bevels, separation from carbon steel, dry wrapping, and labels that remain readable through receiving Receiving teams should photograph wet, torn, crushed, or shifted packaging before material is moved, because later handling can obscure the original condition.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"claims-and-traceability\">\uc8fc\uc7a5 \ubc0f \ucd94\uc801\uc131<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A proportionate stainless steel pipe inspection inspection plan normally reviews grade identity, dimensions, ovality, straightness, weld condition where applicable, surface, ends, markings, and required pressure or nondestructive tests. The sampling frequency, instruments, measurement locations, and acceptance limits should be agreed before shipment when the order is critical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Documentation for stainless steel pipe inspection may include material test report, dimensional record, weld or process records where required, test certificates, and traceability list. Match every certificate and test report to permanent markings or controlled bundle labels before material is cut. Records should connect the inspected material to its labels or traceability references so that a finding can be isolated without placing unrelated material on hold.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"quality-comparison-table\">\ud488\uc9c8 \ube44\uad50\ud45c<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The correct stainless steel pipe inspection requirement depends on what the buyer is trying to protect. The comparison below turns common purchasing priorities into practical specification actions.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uad6c\ub9e4\uc790 \uc6b0\uc120\uad8c<\/th><th>\uc815\uc758\ub418\uc9c0 \uc54a\uc740 \uacbd\uc6b0 \uc704\ud5d8<\/th><th>\uc720\uc6a9\ud55c \uad6c\ub9e4 \uc8fc\ubb38 \uc791\uc5c5<\/th><\/tr><\/thead><tbody><tr><td>\uce58\uc218 \ub9de\ucda4<\/td><td>\uc7ac\uc791\uc5c5, \uc870\ub9bd \ubd88\ub7c9 \ub610\ub294 \ubd88\uc548\uc815\ud55c \ucc98\ub9ac<\/td><td>\uc0c1\ud0dc \uacf5\uce6d \uce58\uc218, \uacf5\ucc28 \ubc0f \uce21\uc815 \ubc29\ubc95<\/td><\/tr><tr><td>\uc81c\uc791<\/td><td>\uade0\uc5f4, \uc65c\uace1, \uacf5\uad6c \ubb38\uc81c \ub610\ub294 \uc811\ud569 \ubd88\ub7c9<\/td><td>\ud504\ub85c\uc138\uc2a4, \uc7ac\ub8cc \uc0c1\ud0dc \ubc0f \uc784\uacc4 \ud615\uc0c1\uc758 \uc774\ub984\uc744 \uc9c0\uc815\ud569\ub2c8\ub2e4<\/td><\/tr><tr><td>\ud45c\uba74 \uc131\ub2a5<\/td><td>\ucf54\ud305, \uc811\ucc29, \ubd80\uc2dd \ub610\ub294 \uc678\uad00 \ubb38\uc81c<\/td><td>\ub9c8\uac10, \ubcf4\ud638 \ubc0f \ub208\uc5d0 \ubcf4\uc774\ub294 \ud5c8\uc6a9 \uad6c\uc5ed\uc744 \uc815\uc758\ud569\ub2c8\ub2e4<\/td><\/tr><tr><td>\ucd94\uc801\uc131<\/td><td>\ub290\ub9b0 \uc8fc\uc7a5\uacfc \ubd88\ud655\uc2e4\ud55c \ubb3c\uc9c8\uc801 \uc815\uccb4\uc131<\/td><td>\uc778\uc99d\uc11c, \ub77c\ubca8, \ub85c\ud2b8 \uc5f0\uacb0 \uac80\uc0ac \uae30\ub85d \uc694\uccad<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">For stainless steel pipe inspection, the strongest specification is not the longest one. It is the specification that links each requirement to a drawing feature, process limit, service condition, or receiving check. Requirements that cannot be measured or connected to use should be clarified before the order is placed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"receiving-checklist\">\uccb4\ud06c\ub9ac\uc2a4\ud2b8 \ubc1b\uae30<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A complete stainless steel pipe inspection request should give suppliers the same technical basis. Buyers can review <a href=\"https:\/\/www.huanhaizhongke.com\/ko\/%ec%a0%9c%ed%92%88\/stainless-steel-pipe\/\">\uc2a4\ud14c\uc778\ub9ac\uc2a4 \uad00 \uc81c\ud488 \uba85\uc138\uc11c<\/a> \uadf8\ub9ac\uace0 \uad00\ub828 <a href=\"https:\/\/www.huanhaizhongke.com\/ko\/stainless-steel-pipe-surface-finish-guide\/\">\uc2a4\ud14c\uc778\ub808\uc2a4 \uc2a4\ud2f8 \ud30c\uc774\ud504 \ud45c\uba74 \ub9c8\uac10 \uac00\uc774\ub4dc<\/a> \ubb38\uc758\ub97c \ub9c8\ubb34\ub9ac\ud558\uae30 \uc804\uc5d0.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Identify the application and governing standard for stainless steel pipe inspection.<\/li><li>\uc0c1\ud0dc \ub4f1\uae09, \uc0c1\ud0dc \ub610\ub294 \uc628\ub3c4 \ubc0f \ubaa8\ub4e0 \uacf5\uce6d \uce58\uc218.<\/li><li>\uacf5\ucc28, \uac00\uc7a5\uc790\ub9ac \ub610\ub294 \ub05d \uc0c1\ud0dc, \uc784\uacc4 \ud45c\uba74 \uc601\uc5ed\uc744 \uc815\uc758\ud569\ub2c8\ub2e4.<\/li><li>\uc808\ub2e8, \uc131\ud615, \uac00\uacf5, \uc6a9\uc811, \ucf54\ud305 \ub610\ub294 \uc811\ud569\uc5d0 \ub300\ud574 \uc124\uba85\ud569\ub2c8\ub2e4.<\/li><li>\uac80\uc0ac, \uc778\uc99d\uc11c, \ucd94\uc801\uc131, \ub77c\ubca8\ub9c1 \ubc0f \ud3ec\uc7a5 \uc694\uad6c \uc0ac\ud56d\uc744 \ub098\uc5f4\ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving stainless steel pipe inspection, procurement should confirm that the quotation has no silent substitutions or vague phrases such as standard quality where the project needs a named condition. Technical exceptions should be written and resolved before production.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-stainless-steel-pipe-inspection-specification\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should a stainless steel pipe inspection specification include?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>\uc801\uc6a9\uc5d0 \ud544\uc694\ud55c \uad00\ub9ac \ud45c\uc900, \ub4f1\uae09 \ub610\ub294 \uc870\uac74, \uce58\uc218, \uacf5\ucc28, \ud45c\uba74, \ucc98\ub9ac \uacbd\ub85c, \uac80\uc0ac \ubb38\uc11c, \ucd94\uc801\uc131 \ubc0f \ud3ec\uc7a5\uc744 \uc2dd\ubcc4\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-stainless-steel-pipe-inspection-inspection\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\uad6c\ub9e4\uc790\ub294 \uc5b4\ub5bb\uac8c \uac80\uc0ac\ud574\uc57c \ud558\ub294\uac00 <\/h3>\n<div class=\"rank-math-answer\">\n\n<p>\uc778\uc99d\uc11c\uc640 \ub77c\ubca8\uc744 \uba3c\uc800 \uc77c\uce58\uc2dc\ud0a8 \ub2e4\uc74c \ubb38\uc11c\ud654\ub41c \uc0d8\ud50c\ub9c1 \uacc4\ud68d\uc744 \uc0ac\uc6a9\ud558\uc5ec \uce58\uc218, \uc81c\ud488 \ubaa8\uc591, \ud45c\uba74, \uac00\uc7a5\uc790\ub9ac \ub610\ub294 \ub05d, \uad6c\ub9e4 \uc8fc\ubb38\uc11c\uc5d0 \uba85\uba85\ub41c \ud14c\uc2a4\ud2b8\ub97c \ud655\uc778\ud569\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-stainless-steel-pipe-inspection-tolerance\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\ub354 \uc5c4\uaca9\ud55c \uad00\uc6a9\uc740 \uc5b8\uc81c \uc815\ub2f9\ud654\ub429\ub2c8\uae4c?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>\ud45c\uc900 \ubcc0\ud615\uc774 \uc644\uc131 \ubd80\ud488\uc758 \ud54f, \ubc00\ubd09, \uac00\uacf5 \ud5c8\uc6a9\ub7c9, \uc131\ud615, \ub77c\uc778 \uc548\uc815\uc131, \uc678\uad00 \ub610\ub294 \uae30\ud0c0 \uce21\uc815 \uac00\ub2a5\ud55c \uc694\uad6c \uc0ac\ud56d\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce60 \uc218 \uc788\ub294 \uacbd\uc6b0 \ub354 \uc5c4\uaca9\ud55c \ud5c8\uc6a9 \uc624\ucc28\uac00 \uc815\ub2f9\ud654\ub429\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-stainless-steel-pipe-inspection-sample\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\uad6c\ub9e4\uc790\ub294 \ub300\ub7c9 \uc8fc\ubb38 \uc804\uc5d0 \uc0d8\ud50c\uc744 \uc694\uccad\ud574\uc57c \ud569\ub2c8\uae4c?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>\uc0d8\ud50c \ub610\ub294 \uccab \ubc88\uc9f8 \uae30\uc0ac \uc2dc\ud5d8\uc740 \uc7ac\ub8cc\uac00 \ubb38\uc11c\ub9cc\uc73c\ub85c\ub294 \ud655\uc778\ud560 \uc218 \uc5c6\ub294 \uae4c\ub2e4\ub85c\uc6b4 \uc131\ud615, \ud654\uc7a5\ud488, \uc811\ud569, \ucf54\ud305 \ub610\ub294 \uc815\ubc00 \uac00\uacf5 \uc694\uad6c \uc0ac\ud56d\uc5d0 \uc9c1\uba74\ud560 \ub54c \ud569\ub9ac\uc801\uc785\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-stainless-steel-pipe-inspection-documents\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">\uc5b4\ub5a4 \uc11c\ub958\uac00 \uac00\uc7a5 \uc911\uc694\ud569\ub2c8\uae4c?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The required documents depend on the project, but stainless steel pipe inspection commonly needs a material certificate, traceability, dimensional or test records where specified, and a packing list linked to the shipment.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"request-a-quality-review\">\ud488\uc9c8 \uac80\ud1a0\ub97c \uc694\uccad\ud558\uc138\uc694<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send Huanhai Zhongke the drawing, standard, grade, dimensions, process route, service environment, and inspection needs for a stainless steel pipe inspection specification review before requesting a quotation.<\/p>","protected":false},"excerpt":{"rendered":"<p>stainless steel pipe inspection affects more than the line item on a purchase order. It influences whether material fits the drawing, runs through the intended process, passes receiving inspection, and performs in service. Inspection depth should follow service criticality, product standard, manufacturing route, welding status, cleanliness, and project code. This stainless steel pipe inspection guide [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1096,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":"","footnotes":""},"categories":[30],"tags":[],"class_list":["post-2615","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-news"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/posts\/2615","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/comments?post=2615"}],"version-history":[{"count":0,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/posts\/2615\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/media\/1096"}],"wp:attachment":[{"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/media?parent=2615"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/categories?post=2615"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.huanhaizhongke.com\/ko\/wp-json\/wp\/v2\/tags?post=2615"}],"curies":[{"name":"\uc6cc\ub4dc\ud504\ub808\uc2a4","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}